Construction of riverbank stabilization and riparian enhancement project along an eroding bank of the Bow River in Varsity Heights (Dale Hodges Park), followed by 3-year maintenance period.
Work includes: install and maintain temporary perimeter fencing, erosion sediment controls; planting trees, shrubs, forbs, willow stakes; seeding; watering via above-ground temporary irrigation system; weed control; general site maintenance; performance monitoring; installation of permanent pathway guardrail.